Software AG Products 10.7 | Designing and Implementing Business Process Models | ARIS Method manual | Balanced Scorecard method | Developing a Balanced Scorecard with ARIS BSC | Creating Balanced Scorecards with ARIS BSC
 
Creating Balanced Scorecards with ARIS BSC
 
Specification of perspectives
Balanced Scorecard system structure specification
Cause-and-effect relationship specification
Specification of initiatives and KPIs to monitor objectives
Description of KPIs and their relationships
Specification of perspectives
At the start of a Balanced Scorecard project, the perspectives should be specified within the strategic plan. These perspectives are valid for all corporate scorecards.
The Perspective object type is available for this purpose. Perspectives can be modeled in the BSC cause-and-effect diagram.
Perspectives are linked via the is influenced by connection. There is no need to define a specific sequence. However, establishing a logical structure (with the individual perspectives arranged in a sequence) considerably simplifies automatic generation of a model. Furthermore, the logical structure of the cause-and-effect chain becomes more transparent.