Mashables and Mashups : Views for Mashups and Mashables : Built-in MashZone NextGen Views : Gantt Chart : Configure This View
Configure This View
1. If needed, change the path to the repeating items that represent tasks in Select Dataset.
2. Drag the title of a text column with the title or short description to the Task field.
3. Drag the title of a date column to the Task Start Date field.
4. Drag the title of a date column to the Task End Date field.
5. Complete any of the following optional fields:
*Predecessors: drop the title of a numeric column with dependency information for tasks in this field. This must contain only a single integer that identifies the index number for a task that this task depends on.
*Percentage Completion: drop the title of a numeric column with percentage of completion information for tasks in this field. Numbers must be either decimal, between 0 and 1, or in the form nnn%.
*Processes: drop the title of an alphanumeric column with grouping categories for tasks in this field. All tasks with the same category appear in a single row of the chart.
*Tasks Tooltip: drop the title of an alphanumeric column with alternate text for task tooltips in this field.
The visual effects of these fields provide different combinations. For more information, see Visual Effects of Optional Data Configuration for Gantt Charts.
6. If needed, change the format to match the date format used in task start and end dates. This default to mm/dd/yyyy.
7. Click Next and set an optional Caption or Subcaption for the chart.
You can also Include Dynamic Content in Captions and Labels if desired.
8. If needed, click Switch to advanced mode to set other visual properties for the chart. See Advanced Configuration Properties for details.
9. Preview and save the view.
Copyright © 2013-2016 Software AG, Darmstadt, Germany.

Product LogoContact Support   |   Community   |   Feedback