Recall that if user-defined packages are properly configured with a dependency on the adapter package (as described in
Package Dependency Requirements and
Guidelines), at startup
Integration Server automatically loads or reloads all packages in the proper order: the WmART package first, the adapter package next, and the node packages last. You should not need to manually reload the WmART package.