Script | Description |
wm_install_into_workorder.sql | Runs the scripts listed below, except the uninstall script. |
wm_into_workorder_pkg.sql | Installs WM_WIP_IMP_HANDLER_PKG. WM_HANDLE_WIP_JOB, which calls the WM_CONC_REQUEST. WM_REQUEST_SUBMIT procedure to submit the Work Order Import process. |
wm_into_workorder_seq.sql | Creates the following components: WM_WIP_GROUP_ID_S, which creates the GROUP_ID sequence WM_WIP_HEADER_ID_S, which creates the HEADER_ID sequence |
wm_drop_into_workorder.sql | Uninstalls all components created by wm_install_into_workorder.sql. |
Field Name | Maps to Column | Description |
ALLOW_EXPLOSION | ALLOW_EXPLOSION | Determines whether you can run the exploder, which creates child records in addition to the job header record. |
ALTERNATE_BOM_ DESIGNATOR | ALTERNATE_ BOM_DESIGNATOR | Alternate Bill of Materials used in job or schedule. |
ALTERNATE_ROUTING_ DESIGNATOR | ALTERNATE_ ROUTING_ DESIGNATOR | Alternate routing used in a job or repetitive schedule. |
BOM_REFERENCE_ITEM | BOM_ REFERENCE_ID | Assembly identifier used as a routing reference for scheduling of nonstandard job. |
BOM_REVISION | BOM_REVISION | Revision to the Bill of Materials. |
BOM_REVISION_DATE | BOM_REVISION_DATE | Date of inventory item revision that explodes the Bills of Material used in the job or schedule. |
CLASS_CODE | CLASS_CODE | Required only for Loading Non-Standard Discrete Job. Accounting class associated with job or repetitive assembly. |
COMPLETION_ LOCATOR_SEGMENTS | COMPLETION_ LOCATOR_ SEGMENTS | |
COMPLETION_ SUBINVENTORY | COMPLETION_ SUBINVENTORY | |
DAILY_PRODUCTION_RATE | DAILY_PRODUCTION_ RATE | Required only for Repetitive Schedule. Schedule daily quantity. |
DEMAND_CLASS | DEMAND_CLASS | Type of demand the job or schedule satisfies. |
DESCRIPTION | DESCRIPTION | |
DUE_DATE | DUE_DATE | Due date of the job being created. |
FIRM_PLANNED_FLAG | FIRM_PLANNED_FLAG | Control for MRP rescheduling. |
FIRST_UNIT_START_DATE | FIRST_UNIT_START_DATE | Not required for updating Discrete Job or Schedule. Date job or schedule should start. |
FIRST_UNIT_COMPLETION_ DATE | FIRST_UNIT_ COMPLETION_DATE | Not required for updating Discrete Job or Schedule. Date job or schedule should complete the first unit. |
JOB_NAME | JOB_NAME | WIP job name. |
KANBAN_CARD_NUMBER | KANBAN_CARD_ID | Production kanban replenished by the WIP entity being created. |
LAST_UNIT_COMPLETION_ DATE | LAST_UNIT_ COMPLETION_DATE | Not required only in case of updating discrete jobs. Date job or schedule should end. |
LAST_UNIT_START_DATE | LAST_UNIT_START_DATE | Not required only in case of updating discrete jobs. Date job or schedule should begin processing the last unit. |
LINE_CODE | LINE_CODE | Required for loading repetitive schedule. |
LOAD_TYPE | LOAD_TYPE | Required. Type of interface record. Use: 1 for Create standard discrete job. 2 for Create pending repetitive schedule. 3 for Update standard or non- standard discrete job. 4 for Create non-standard discrete job. |
LOT_NUMBER | LOT_NUMBER | |
NET_QUANTITY | NET_QUANTITY | Job net quantity. |
ORGANIZATION_NAME | ORGANIZATION_ID | Required. Organization name. |
OVERCOMPLETION_TOLERANCE_ TYPE | OVERCOMPLETION_ TOLERANCE_TYPE | Unit of OVERCOMPLETION_ TOLERANCE_VALUE(percent or amount). |
OVERCOMPLETION_ TOLERANCE_VALUE | OVERCOMPLETION_ TOLERANCE_VALUE | Percent or amount above expected quantity that this entity is allowed to complete. |
PRIMARY_ITEM_CODE | PRIMARY_ITEM_ID | Required for loading standard discrete jobs and repetitive schedule. Inventory item identifier for the assembly that the job or repetitive schedule creates. |
PRIORITY | PRIORITY | Priority to assign to the job being created. |
PROCESSING_WORK_DAYS | PROCESSING_ WORK_DAYS | Required only for loading repetitive schedule. Processing days of repetitive schedule. |
PROJECT_NAME | PROJECT_ID | Project reference for the discrete job. Get PROJECT_ID from PA_PROJECTS_ALL. |
REPETITIVE_SCHEDULE_ID | REPETITIVE_ SCHEDULE_ID | WIP repetitive schedule identifier. |
ROUTING_REFERENCE_ NUMBER | ROUTING_ REFERENCE_ID | Assembly identifier used as routing reference for scheduling of nonstandard job. |
ROUTING_REVISION | ROUTING_REVISION | Revision to the assembly routing. |
ROUTING_REVISION_DATE | ROUTING_ REVISION_DATE | |
SCHEDULE_GROUP_NAME | SCHEDULE_ GROUP_NAME | |
SCHEDULING_METHOD | SCHEDULING_ METHOD | |
SOURCE_CODE | SOURCE_CODE | Code of the process that generated the interface record. |
SOURCE_LINE_ID | SOURCE_LINE_ID | Identifier used by source shop floor control system. Null if created by Oracle Work In Process. |
START_QUANTITY | START_QUANTITY | Job start quantity. |
STATUS_TYPE | STATUS_TYPE | Status of the job or repetitive schedule to be loaded. |
TASK_NUMBER | TASK_NUMBER | |
WIP_ENTITY_NAME | WIP_ENTITY_ID | Required only for updating discrete jobs. WIP job or repetitive assembly name. |
WIP_SUPPLY_TYPE | WIP_SUPPLY_TYPE | Method of material consumption within WIP. |
Field Name | Maps to Column | Description |
ACTIVITY_NAME | ACTIVITY_ID | WIP job or repetitive assembly identifier. |
APPLIED_RESOURCE_UNITS | APPLIED_RESOURCE_UNITS | Amount of resource units charged. |
APPLIED_RESOURCE_VALUE | APPLIED_RESOURCE_VALUE | Value of resource units charged. |
ASSIGNED_UNITS | ASSIGNED_UNITS | Required only for adding resource. Number of resources assigned to work. |
AUTOCHARGE_TYPE | AUTOCHARGE_TYPE | Required only for adding resource. Method of charging the resource. |
BACKFLUSH_FLAG | BACKFLUSH_FLAG | Required only for adding operations. Back flush control code. |
BASIS_TYPE | BASIS_TYPE | Required only for adding resource. Basis for scheduling and charging resource. |
COMPLETION_DATE | COMPLETION_DATE | Required only for adding resource. Scheduled completion date of the resource. |
COUNT_POINT_TYPE | COUNT_POINT_TYPE | Required only for adding operations. |
DATE_REQUIRED | DATE_REQUIRED | Operation requirement start date. |
DEPARTMENT_CODE | DEPARTMENT_ID | Required only for adding operations. |
DESCRIPTION | DESCRIPTION | |
FIRST_UNIT_ COMPLETION_DATE | FIRST_UNIT_ COMPLETION_DATE | Required only for adding operations. First unit scheduled completion date. |
FIRST_UNIT_START_DATE | FIRST_UNIT_START_DATE | Required only for adding operations. First unit scheduled receipt date. |
INVENTORY_ITEM_ CODE_NEW | INVENTORY_ ITEM_ID_NEW | Required only for adding components. New material requirement identifier. |
INVENTORY_ITEM_ CODE_OLD | INVENTORY_ ITEM_ID_OLD | Required only for changing components. Old material requirement identifier. |
LAST_UNIT_COMPLETION_ DATE | LAST_UNIT_ COMPLETION_ DATE | Required only for adding operations. Last unit scheduled completion date. |
LAST_UNIT_START_DATE | LAST_UNIT_START_DATE | Required only for adding operations. Last unit scheduled receipt date. |
LOAD_TYPE | LOAD_TYPE | Required. Material or resource Requirement. Use: 1 for Loading a resource. 2 for Loading a component. 3 for Loading an operation. 4 for Loading multiple resource usage. |
MINIMUM_TRANSFER_ QUANTITY | MINIMUM_ TRANSFER_ QUANTITY | Required only for adding operations. Minimum operation transfers quantity. |
MPS_DATE_REQUIRED | MPS_DATE_REQUIRED | Date used by MPS relief process. |
MPS_REQUIRED_QUANTITY | MPS_REQUIRED_QUANTITY | Quantity used by MPS relief process. |
MRP_NET_FLAG | MRP_NET_FLAG | Required only for adding components. Indicates whether or not MRP should consider the component requirement in its netting process. |
OPERATION_SEQ_NUM | OPERATION_SEQ_NUM | Required. Operation sequence number within a routing. |
ORGANIZATION_NAME | ORGANIZATION_ID | |
QUANTITY_ISSUED | QUANTITY_ISSUED | Part quantity issued. Required only for adding components. |
QUANTITY_PER_ASSEMBLY | QUANTITY_PER_ASSEMBLY | Part usage quantity. Required only for adding components. |
REQUIRED_QUANTITY | REQUIRED_QUANTITY | Part quantity required. Required only for adding components. |
RESOURCE_CODE_NEW | RESOURCE_ID_NEW | Resource identifier to be added or changed. Required only for adding resource. |
RESOURCE_CODE_OLD | RESOURCE_ID_OLD | Resource identifier existing in current jobs or schedules. Required only for changing resource. |
RESOURCE_SEQ_NUM | RESOURCE_SEQ_NUM | Resource sequence number. Required only for adding or changing resource. |
SCHEDULED_FLAG | SCHEDULED_FLAG | Method of scheduling the resource. Required only for adding resource. |
STANDARD_RATE_FLAG | STANDARD_RATE_FLAG | Indicates whether the resource is charged at the standard rate. |
STANDARD_OPERATION_ CODE | STANDARD_ OPERATION_ID | Standard Operation Identifier. |
START_DATE | START_DATE | Scheduled start date of the resource. Required only for adding resource. |
SUBSTITUTION_TYPE | SUBSTITUTION_TYPE | Substitution Type. Use: 1 for Delete. 2 for Add. 3 for Change. |
SUPPLY_LOCATOR_ DESCRIPTION | SUPPLY_LOCATOR_ ID | Locator used to supply component to WIP. |
SUPPLY_SUBINVENTORY | SUPPLY_SUBINVENTORY | Subinventory used to supply component to WIP. |
USAGE_RATE_OR_AMOUNT | USAGE_RATE_OR_AMOUNT | Rate per assembly or amount per job or schedule. Required only for adding resource. |
UOM_CODE | UOM_CODE | Code for unit of measure. Required only for adding resource. |
WIP_SUPPLY_TYPE | WIP_SUPPLY_TYPE | Method of material consumption within WIP. |