Installer 10.15 | Complete Installation and Upgrade Information for Software AG Products | Upgrading Software AG Products On Premises | Upgrade Optimize | Migrate Optimize | Upgrade from 9.9 or Later: Migrate Using the Define Environments Page in My webMethods Server | Deploy the New Optimize Environment
 
Deploy the New Optimize Environment
Unless otherwise noted, see Configuring BAM for detailed instructions on the steps below.
1. Start the new Optimize components you installed. These components can include the Analytic Engine, Infrastructure Data Collector, and the Web Services Data Collector.
2. Start the Universal Messaging you are using with the new release.
3. Deploy your new Optimize environment. For instructions, see Configuring BAM.
4. In My webMethods, go to the My webMethods > System Settings > Servers page.
*If you have BPMS installed, select the BPM and BAM option and identify the new Analytic Engine and the new Integration Server that hosts Monitor. For the hosts, you can specify DNS name or IP address.
*If you have BPMS installed, but are not using BPM (that is, you are using only Optimize), select the BAM only option and identify the new Analytic Engine. For the host, you can specify DNS name or IP address.
5. Start the Analytic Engine and then click Check Server Status to make sure the server is available (green icon). It might take some time for the server to start (for example, 15 minutes). Then click Save.