Installer 10.11 | Complete Installation and Upgrade Information for Software AG Products | Upgrading Software AG Products On Premises | Upgrade Optimize | Update Connections to Other Products
 
Update Connections to Other Products
1. Update the connection to Process Engine.
a. Open Integration Server Administrator and point to a new Integration Server that hosts a Process Engine.
b. Go to the Packages > Management page and click for the WmPRT package.
c. Click Settings in the left navigation bar and then click Edit Process Engine Settings.
d. In the JMS Server URL field, identify the Universal Messaging host name and port as nsp://host:port. The default port is 9000.
e. Click Submit and then reload the WmPRT package.
f. Repeat these steps for every new Integration Server that hosts a Process Engine.
2. Update the connection to the Optimize support package on Integration Server.
a. Open Integration Server Administrator or Microservices Runtime Administrator and point to a new Integration Server or Microservices Runtime that hosts an Optimize Support package.
b. Go to the Packages > Management page and click for the WmOptimize package.
c. Identify the Analytic Engine host machine and port. The default port is 12503.
d. In the JMS Server URL field, identify the Universal Messaging host name and port as nsp://host:port. The default port is 9000.
e. Click Submit and then reload the WmOptimize package.
f. Repeat these steps for every Integration Server or Microservices Runtime that hosts an Optimize Support package.