webMethods Dynamic Business Orchestrator 10.1 | Administering Process Models | Synchronizing Stage Settings
 
Synchronizing Stage Settings
You can create, modify, and delete stage settings in two locations:
*In Software AG Designer, on the Stagespage in the Properties view.
*In webMethods Monitor,on the Business Process administration pages in My webMethods.
Changes to the stage settings from webMethods Monitor's Business Process administration pages are saved to the Process Audit database. The saved changes overwrite the existing setting details in the database. As a best practice, you should ensure that your stage settings are always synchronized between the two locations.
Important: Deleting a step that is contained in a process stage without first synchronizing the stage settings with the database can lead to the process being out of sync with edits done in Monitor. Always click the stage settings Synchronize button immediately before you delete any steps in Designer that are contained in a stage.
* To synchronize stage settings:
1. Open the process model and in the process editor, click the design canvas to select the entire process.
2. In the Properties view, click the Stages tab.
3. Click Synchronize. Designer retrieves the stage settings from the Process Audit database and applies them to the process model.
4. Click Save to save the stage settings to the local workspace.
To make your changes available to the runtime, you must upload the process model. Uploading the process overwrites the existing stage settings in the Process Audit database.

Copyright © 2018 | Software AG, Darmstadt, Germany and/or Software AG USA, Inc., Reston, VA, USA, and/or its subsidiaries and/or its affiliates and/or their licensors.