Integrate Software AG Products Using Digital Event Services : MashZone NextGen Help : Appendix : Legacy Presto components : Mashables and Mashups : Views for Mashups and Mashables : Built-in MashZone NextGen Views : Sparkline : Configure This View
Configure This View
Choose the SparkLine view and:
1. If needed, change the Select Dataset field to find the repeating items that contain the fields you want to chart. This must be the parent node to the fields you want to use and it must be a repeating node.
2. Drag at least one title for a column that contains numeric data into the Series field. Each column you add to Series adds a line to the chart.
Tip:  
For best results, limit the number of series (the number of lines within the chart) to 8 or less.
It is also best if the numeric data are distinctly different but within a similar range of values. One very large or very small value can skew the chart scale, making it difficult to see or understand other data.
3. For each series, set these properties:
*Set a Title, and optionally a Subtitle for the line. Titles appear as a label at the beginning of the line.
*If needed, add a Number Prefix or Number Sufix for the numeric labels for this line.
Common examples might be $ as the prefix or % as the suffix.
4. Click Next and optionally set a Caption for the chart.
You can also Include Dynamic Content in Captions and Labels if desired.
5. If needed, click Switch to advanced mode to set other visual properties for the chart. See Advanced Configuration Properties for details.
6. Preview the chart at any time.
7. Once you are satisfied, save the view:
a. Click Finish.
b. Give the view a name, and optional description.
c. Click Save.
Copyright © 2017 Software AG, Darmstadt, Germany.

Product LogoContact Support   |   Community   |   Feedback