Designing and Implementing Business Process Models : Working with Business Rules in My webMethods : Working with Decision Trees : Modifying a Decision Tree : Modifying Condition Links or Assignment Result Nodes in Direct Edit Mode
Modifying Condition Links or Assignment Result Nodes in Direct Edit Mode
You can modify condition links or assignment result nodes in direct edit mode.
To modify a condition link or assignment result node in direct edit mode:
1. Open the decision tree as described in Opening a Decision Entity.
2. Lock the decision tree as described in Locking a Decision Entity.
3. Click the condition link or assignment result node you want to modify.
4. In the inline editor, select an operator as specified in About Condition Operators or About Result Operators.
Important:  
Adding only an operator without entering a literal value results in a semantically invalid condition link or assignment result node.
5. Enter a literal value in the input field as required:
Note:  
The literal value must match the data type as specified in About Data Type Assignment.
For this data type ...
You can do this ...
Boolean
Select true or false from the drop down list.
Date
a. Click the icon.
b. Select the date.
c. Enter a time of day (optional).
Note:  
The format and time zone of displayed date and time values can be configured in the My Profile settings. The webMethods Business Rules functionality only supports hours, minutes and seconds.
Byte
Character
Double
Float
Integer
Long
Short
Type the literal value.
String
Type the literal value.
6. Click to save the changes, to discard the changes, or to clear the values. To enter the advanced editor, click (condition link) or (assignment result node) and modify the condition link or assignment result node as described in Modifying Condition Links or Assignment Result Nodes with the Editor.
Copyright © 2017 Software AG, Darmstadt, Germany. (Innovation Release)

Product LogoContact Support   |   Community   |   Feedback