Field | Specifies... | ||
Maximum number of rows per to-do list template | The maximum number of rows you can add to a to-do list template.
| ||
Allow tags for to-do list | Whether or not you can use tags for to-do lists. Using tags, you can search the to-do lists or the parent task of to-do lists. You can view the tag of a to-do list in the task detail page of the to-do list task. | ||
Default tag for to-do list | The default tag for to-do lists. | ||
Enable to-do list polling | Whether or not to poll Task Engine for the status of to-do lists. If you have enabled to-do list polling, when you start a to-do list, Business Console polls the Task Engine in regular intervals and displays the updated status of the start operation in the To-Do List dialog. If you want to stop polling that has been going on for a long time, click at the end of the polling progress bar. You can disable to-do list polling to avoid frequent polling of Task Engine. If you have disabled to-do list polling, Refresh polling icon is available on the To-Do List dialog for starting manual polling. |