Designer 10.7 | Cloudstreams Development Help | CloudStreams Provider Project | SOAP Connector | Changing the Sequence of Local Assignments
 
Changing the Sequence of Local Assignments
You can assign override values at the SOAP request parameter level for a SOAP operation. See Assigning Values for information on how to assign values. The sequence of local assignments can be changed. The assignments will be applied in the sequence they appear in the Order pane.
*To change the sequence of local assignments
1. On the Request pane, click the Order tab.
The Order pane displays all the assignments, including global assignments made for the selected operation.
2. In the Order pane, select the desired rows and click the Up, Top, Down, or Bottom options to move the assignment upwards or downwards in the panel. Assignments will be applied at the request level in the sequence they appear.
Note:
You will not be able to change the sequence of global assignments at the request level. See Configuring Assignments in Resource Groups on how to change the sequence of global assignments.