Integrate Software AG Products Using Digital Event Services 10.4 | Integrate Software AG Products Using Digital Event Services | MashZone NextGen Help | Appendix | Legacy Presto components | Mashables and Mashups | Mashups in MashZone NextGen Wires | Creating Mashups in Wires | Add Actions or Other Blocks | Run Several Blocks Simultaneously
 
Run Several Blocks Simultaneously
Use the Parallel action block to run two or more mashups, mashables or action blocks at the same time in your mashup. Typically, this helps to improve performance for the mashup.
Note: Each block in Parallel runs independently of all other blocks within the loop. Thus, you can only wire blocks in Parallel to blocks that are outside of Parallel.
1. Add Parallel to the canvas. This defines a section of the canvas to use to hold the blocks you want to run simultaneously.
2. Add mashable, mashup or action blocks and drop them into the canvas area for Parallel.
The area of the canvas that Parallel encompasses automatically extends as you add blocks.
3. Add the inputs or outputs to these blocks outside Parallel. Draw connections between blocks outside Parallel to blocks inside Parallel just as you normally would.

Copyright © 2019 | Software AG, Darmstadt, Germany and/or Software AG USA, Inc., Reston, VA, USA, and/or its subsidiaries and/or its affiliates and/or their licensors.
Innovation Release