Business Rules 10.7 | webMethods Business Rules Web Help | Working with Business Rules in My webMethods | Working with Decision Trees | Modifying a Decision Tree | Modifying Condition Links or Assignment Result Nodes in Direct Edit Mode
 
Modifying Condition Links or Assignment Result Nodes in Direct Edit Mode
You can modify condition links or assignment result nodes in direct edit mode.
*To modify a condition link or assignment result node in direct edit mode:
1. Open the decision tree as described in Opening a Decision Entity.
2. Lock the decision tree as described in Locking a Decision Entity.
3. Click the condition link or assignment result node you want to modify.
4. In the inline editor, select an operator as specified in About Condition Operators or About Result Operators.
Important:
Adding only an operator without entering a literal value results in a semantically invalid condition link or assignment result node.
5. Enter a literal value in the input field as explained in the following table:
Note:
The literal value must match the data type as specified in About Data Type Assignment.
For this data type
You can do this
Boolean
Select true or false from the drop-down list.
Date
a. Click The calendar icon.
b. Select the date.
c. Enter a time of day (optional).
Note:
The format and time zone of displayed date and time values can be configured in the My Profile settings. Business Rules only supports hours, minutes, and seconds.
Byte
Character
Double
Float
Integer
Long
Short
Type the literal value.
String
Type the literal value.
6. Click The save button to save the changes, The discard button to discard the changes, or The clear button to clear the values. To open the built-in editor, click The edit condition icon (condition link) or The edit result icon (assignment result node), and modify the condition link or assignment result node as described in Modifying Condition Links or Assignment Result Nodes with the Editor.