CONNX Data Integration Suite 14.8.0 | DataSync | Schedules Page | Designing a Schedule | Step 2 - Defining a Schedule
 
Step 2 - Defining a Schedule
The Schedules step defines when and how often should a scheduled synchronization run.
*Repeat - The Repeat dropdown specifies how often the task will repeat. Possible values are Daily, Weekly, Monthly, and Yearly.
*Trigger A schedule can trigger at a specific time or can be set to trigger every x Minutes or Hours
*To make a synch trigger at a specific time, mark the at a specific time radio button and input the desired time in the time field. After that click the plus button to add the time to the list of specific times. Click the minus button in a time in the list of specific times to remove it from the list. You can add up to ten specific times to the list.
*To trigger on a per minute or per hour bases, select the every radio button. Then, select the desired number of minutes and the desired value of Minute or Hour from the dropdown box. Click Limit to a timeframe to specify a start and end time.
*Start Date - Use the Calendar Picker to select a Start Date for this schedule.
*End Date - The End Date is optional. To specify an End Date, click the selection button to set it to On and select an End Date from the calendar picker.