Global Tasks
DataSync settings are accessed by clicking Gear Icon -> Settings.
CONNX Data Synchronization enables the user to execute globally scheduled tasks that occur simultaneously with synchronization of data. These tasks can be any sort of operation, including batch files, executable files, backups, or data dumps. Execution of the command is automatic.
Tasks that should not be included in globally scheduled synchronization tasks include any task that requires input from a user. Such tasks cause the synchronization to stop abruptly as it waits for user input.
There are three types of tasks available:
Global Scheduled Synchronization Tasks Global Scheduled Synchronization Tasks can be performed for every scheduled synchronization.
Global On Demand Synchronization Tasks Global On-Demand Synchronization tasks can be performed for every interactive synchronization that is manually started.
Per Schedule Synchronization Tasks These tasks are performed only with specific scheduled synchronizations. They are located on the Schedule page.
You can set up a task to run before synchronization begins and when synchronization finishes with or without errors.
Enter the name of the executable file or batch script (along with any parameters) in the respective text box.