POP000I ADAPOP V##### INITIALISED, EP=######## CIB=########
Explanation

The database interface to the Adabas System Coordinator has been initialized successfully.

Action

None. This message is for information only.


POP001S ADAPOP CANNOT INITIALIZE, GETMAIN ERROR
Explanation

ADAPOP cannot initialize because of a memory shortage.

Action

Increase the region specification for the database job.


POP002S ADAPOP CANNOT INITIALIZE, KERNEL LOAD ERROR
Explanation

ADAPOP failed to locate or load the runtime kernel module CORKRN.

Action

Ensure that the load library containing the kernel module is available to the database job.


POP003E Database proxy module ######## for product ### is invalid (bad eyecatcher)
Explanation

The database component for the indicated product is invalid.

Action

Check and correct the installation.


POP004E Database proxy module ######## for product ### is not supported
Explanation

The database component for the indicated product is not supported by this version of the Adabas System Coordinator Adabas server component.

Action

The affected product is disabled for this Adabas nucleus. Ensure that you use the correct product versions.


POP005E Memory shortage alert-no memory for COR threads, add-ons are deactivated
Explanation

An Adabas option command cannot be completed because of a memory shortage.

Action

The affected commands will receive RSP101/24.

There is a possibility that some critical command-related processing was not able to be performed in the case where this message appears. The most critical situation is where Adabas Fastpath is in full operation for the database (beyond a simple AFPLOOK sample). In this case Fastpath will attempt to automatically switch off optimization for the database to ensure there is no risk to the coherence between cache and database content. The administrator should check to make sure this has happened and if there is any doubt, manually stop the optimization for the database - or shut the entire Fastpath caching down. More memory needs to be made available to the System Coordinator within the database job. This may be achieved by making more memory available to the job (increasing REGION size etc.) or if there is no more memory available for the job then reduceing LBP (or similar) by 1 megabyte should alleviate the problem when the database is next recycled.


POP006S APPEND OF PRODUCT V-CON LIST FAILED
Explanation

This is an internal error.

Action

Contact your Software AG technical support representative.


POP008E IOR FAILURE - FUNCTION: ## ERROR ##
Explanation

An internal error occurred during the processing of an operating system dependent function.

Action

Contact your Software AG technical support representative for assistance.